Stillpage
Selected Work · 2024

Mixed-use commercial canopy system

Austin, Texas30.2672° N · 97.7431° W

340 kWp dual-use canopy · ASTM E1300 wind load certified · 6-month from concept to commissioning.

Mixed-use commercial canopy system
The challenge

Problem

A mixed-use developer required a canopy that delivered both shading for a public plaza and meaningful on-site generation, while satisfying Texas wind-load requirements and ERCOT interconnection timelines.

Our role

Solution

Stillpage matched the developer with a semi-transparent glass-glass module supplier, coordinated structural engineering review, and managed the ERCOT interconnection paperwork. We acted as the single accountable partner across architecture, structural, electrical and the EPC.

By the numbers

Technical specifications

Installed capacity
340 kWp
Canopy area
2,180 m²
Annual yield
512 MWh
Light transmission
28%
Wind load rating
240 km/h
Deployment time
6 months
Compliance

Certifications

  • ASTM E1300 (glass wind & snow load)
  • UL 61730 (PV module safety)
  • UL 3703 (mounting systems)
  • ERCOT distributed generation interconnection
Technology

BIPV types deployed

  • Semi-transparent glass-glass bifacial modules
  • Structural laminated overhead glazing
  • Steel cable-stayed support structure